Everything listed under: Design & documentation

  • 33 York Street :: SYDNEY

    Refurbishment and new BMCSThe building was completely refurbished as a vacant building. The building is 12 stories high and was air conditioned using water-cooled packaged units supplied with condenser water from a new condenser water system.   Read More...

  • Coles Myer DISTRIBUTION CENTRE :: EASTERN CREEK

    75,000m2 distribution centre and administration facilityThe project construction cost was around $70,000,000 with the offices comprising 2,900m2 and the warehouse comprising 37,000m2 under a single roof.The offices were air conditioning using central plant and VAV systems. The warehouse was mechanically ventilated and had unique supply air and extract systems to ensure maximum air movement in the storage rack aisles and at specialist pick and place areas.   Read More...

  • 65 York Street :: SYDNEY

    Complete refurbishment of the building, all mechanical services and controls. This building was completely renovated when James Hardy vacated Australia and was rebadged as Icon House. The building is 12 stories high and was air conditioned using plant located on each floor supplied with chilled water and heating water from central plant located on the roof.   Read More...

  • Traffic Control Centre :: M7 Motorway

    New buildThis purpose built building houses the administration and toll collecting faciliti es for the M7 motorway at eastern creek. The building was part of the $1.5billion project to link the M2, M4 + M5 motorways.The control centre was air conditioned by chilled water AHU’s connected to a central air-cooled chiller installation.   Read More...

  • 78 Waterloo ROAD :: NORTH RYDE

    15,000m2 office developmentThe building was completed in June 2008 and cost around $64,000,000. It features a central atrium serving the first few floors. The building is 8 levels commercial and 2 levels carpark with 14,600m2 NLA.The building achieved a 5 star Green Star Office Design V2.    Read More...