Everything listed under: Sydney

  • 33 York Street :: SYDNEY

    Refurbishment and new BMCSThe building was completely refurbished as a vacant building. The building is 12 stories high and was air conditioned using water-cooled packaged units supplied with condenser water from a new condenser water system.   Read More...

  • 65 York Street :: SYDNEY

    Complete refurbishment of the building, all mechanical services and controls. This building was completely renovated when James Hardy vacated Australia and was rebadged as Icon House. The building is 12 stories high and was air conditioned using plant located on each floor supplied with chilled water and heating water from central plant located on the roof.   Read More...

  • 161 Castlereagh Street :: SYDNEY

    The project comprises a GBCA 6 star Green Star design and as built, 50 storey office tower, retail podium, carpark levels and adjacent heritage buildings Legion House. The development features 57,000m2 of commercial office space and 2,750m2 of retail space. The central energy plant serving these buildings comprises a tri-generation system, electric chillers and gas-fired heating boilers which provide heating and cooling to central air handling plant. Typical commercial floors are conditione...  Read More...

  • 1 FARRER PLACE :: SYDNEY

    The site comprises Governor Phillip Tower and Government Macquarie Tower.Our role on this project is to document and supervise the complete replacement of the building management and controls system, central chiller plant and domestic hot water plant amongst other things such as making the tenant condenser water systems pressure controlled rather than constant flow.GPT + GMTRedundant chiller installation      Read More...

  • The Concourse :: CHATSWOOD

    BuilderFor this project the builder required an independent reviewer of the consultants design and the service contractors installation works and overview of the commissioning and handover process. The building comprises a library, concert hall, theatre for live performances, offices and council administration offices.   Read More...

  • Towns Place East :: SYDNEY

    BuilderFor this project the builder required an independent reviewer of the consultant’s design and the service contractor’s installation works and overview of the commissioning and handover process. The building is 6 levels.   Read More...

  • 2 Market Street :: SYDNEY

    BuilderFor this project the builder required an independent reviewer of the consultants deisgn and the service contractors installation works and overview of the commissioning and handover process. The building is 16 levels and 32,000m2 of NLA.   Read More...

  • 126 Phillip Street :: SYDNEY

    126 Phillip StreetFor this project the developer required an independent reviewer of the builders installation works and overview of the commissioning and handover process. The building is 31 levels and 43,000m2 of NLA.SaveSave   Read More...

  • Darling Island Apartments :: Sydney

    BuilderFor this project the builder required an independent reviewer of the service consultant’s designs and an overview of the contractor’s installation works   Read More...

  • 2 Park Street :: SYDNEY

    PMThis building comprises 41 levels and 74,000m2 of NLA. In this project the commissioning of the building services was overviewed and signed off on behalf of the bankers financing the project.   Read More...

  • Central Park Development :: SYDNEY

    5 star This building comprises multiple residential towers (5), a retail precinct, and multi-level underground car park. The project is aiming to achieve retail, multi-unit residential and precinct 5 star Greenstar design and as built certification. Features include a central district chilled water and heating hot water system serving all buildings from a central energy facility. The role on this project was is an independent commissioning agent and commissioning management.One Central...  Read More...

  • 33 Bligh Street :: SYDNEY

    5 star officeThis building comprises 20 levels of commercial office space. The project is aiming to achieve office 5 star Green Star design and as built certification. Unique features of this project are that it is built over an Ausgrid transformer installation.The role on this project was as an independent commissioning agent and commissioning management.   Read More...

  • Macquarie University Library :: SYDNEY

    This building comprises six levels of library, administration and support areas and is the main library for Macquarie University. Some of the innovative features include an automated book retrieval system, a 1,000,000L thermal storage tank for chilled water.The project achieved an institutional building 4 star Green Star design certification standard. The role on this project was as an independent commissioning agent.   Read More...

  • NAB House :: Sydney

    4 star officeThis building comprises 29 levels of commercial offices. The project required the building services to be upgraded as floor become vacant to achieve commercial 4 star Green Star design certification standard. The role on this project was as an independent commissioning agent.   Read More...

  • 39 Hunter Street :: SYDNEY

    6 star officeThis building comprises 7 levels and 6,000m2 of NLA. The building was the first refurbished heritage commercial 6 star Green Star design certified project in NSW. The role on this project was as an independent commissioning agent.   Read More...

  • Google fit-out Workplace 6 :: PYRMONT

    5 star interiorsThis building comprises 6 levels and 16,200m2 of NLA. The building was the first commercial 6 star Green Star design and as built certified project in NSW. The role on this project was as an independent commissioning agent.   Read More...

  • Workplace 6 :: PYRMONT

    6 star officeThis building comprises 6 levels and 16,200m2 of NLA. The building was the first commercial 6 star Greenstar design and as built certified project in NSW. The role on this project was as an independent commissioning agent.   Read More...

  • Traffic Control Centre :: M7 Motorway

    New buildThis purpose built building houses the administration and toll collecting faciliti es for the M7 motorway at eastern creek. The building was part of the $1.5billion project to link the M2, M4 + M5 motorways.The control centre was air conditioned by chilled water AHU’s connected to a central air-cooled chiller installation.   Read More...

  • 345 George Street :: SYDNEY

    Replace BMCSThis building was fully refurbished with new works taking pace on vacated floors as they became vacant. The building controls were also updated to a building management and controls systems.   Read More...

  • 30 The Bond :: MILLERS POINT

    Upgrade BMCSThis project was an upgrade of the existing building management and controls system and sorting out commissioning issues with the building identified in a report produced by a third party.   Read More...

  • Zenith Centre :: CHATSWOOD

    This building was upgraded as part of an energy improvement focus of the Dexus property group for their entire portfolio of properties. The work included all new building management and controls systems and rebalancing all the mechanical systems.   Read More...

  • Traffic Control Centre :: M7 Motorway

    New buildThis purpose built building houses the administration and toll collecting faciliti es for the M7 motorway at eastern creek. The building was part of the $1.5billion project to link the M2, M4 + M5 motorways.The control centre was air conditioned by chilled water AHU’s connected to a central air-cooled chiller installation.   Read More...

  • 33 York Street :: SYDNEY

    Refurbishment and new BMCSThe building was completely refurbished as a vacant building. The building is 12 stories high and was air conditioned using water-cooled packaged units supplied with condenser water from a new condenser water system.   Read More...

  • Valentine Hotel :: SYDNEY

    RefurbishmentThis boutique hotel was completely refurbished into a 14 suite high end hotel. The building is air conditioned with central chilled water plant providing chilled water to fan coil units in each suite.   Read More...

  • 410 Elizabeth St :: SURRY HILLS

    RefurbishmentThe building was completely refurbished as a fully occupied building. The existing central plant was all replaced with water-cooled packaged unit, one pre stratum.   Read More...

  • 80 PITT STREET :: SYDNEY

    RefurbishmentSaveSave   Read More...

  • 65 YORK STREET :: SYDNEY

    Complete refurbishment of the building, all mechanical services and controls. This building was completely renovated when James Hardy vacated Australia and was rebadged as Icon House. The building is 12 stories high and was air conditioned using plant located on each floor supplied with chilled water and heating water from central plant located on the roof.   Read More...